| 123 Matching results found
: Showing Page 5 of 13, results 41 to 50
|
| Case/Breach |
Defendant's Name |
Hearing Date |
Result |
Fine £ |
Act or Regulation |
| 47360280/01 |
I D Maintenance Limited |
11/12/2025 |
Guilty-Fine |
6,000.00 |
Work at Height Regulations 2005 |
| 47811850/01 |
Matrod Frampton Limited |
05/12/2025 |
Guilty-Fine |
50,000.00 |
Construction (Design and Management) Regulations 2015 |
| 47811850/02 |
Matrod Frampton Limited |
05/12/2025 |
Guilty-Fine |
50,000.00 |
Construction (Design and Management) Regulations 2015 |
| 48345980/01 |
Axis Europe Limited |
05/12/2025 |
Guilty-Fine |
640,000.00 |
Construction (Design and Management) Regulations 2015 |
| 48346010/01 |
Premier Property and Construction Limited |
05/12/2025 |
Guilty-Fine |
160,000.00 |
Construction (Design and Management) Regulations 2015 |
| 48314440/01 |
J Smith Construction Services Limited |
04/12/2025 |
Guilty-Fine |
80,000.00 |
Work at Height Regulations 2005 |
| 48314440/02 |
J Smith Construction Services Limited |
04/12/2025 |
Guilty-No Sep Penalty |
0.00 |
Work at Height Regulations 2005 |
| 48314490/02 |
Mr Joseph Smith |
04/12/2025 |
Guilty-Prison Suspended |
0.00 |
Work at Height Regulations 2005 |
| 48314490/03 |
Mr Joseph Smith |
04/12/2025 |
Guilty-No Sep Penalty |
0.00 |
Work at Height Regulations 2005 |
| 46889090/01 |
Syed Hussain |
02/12/2025 |
Guilty-Community |
0.00 |
Gas Safety (Installation and Use) Regulations 1998 |
| « ‹ prev | Page : 1 2 3 4 5 6 7 8 9 10 | next › » |